Dr (Engr) Humphrey Edereka-Great is Partner-Director, Infrastructures Financial Services (International), at A-D Global Infrastructures, LLC, Technical Partner, International Projects Portfolio Development, Africa and USA, at Redline Develop, LLC, Texas, USA. Dr. Great is also the Team Leader (Africa) at Teshmont Consultants Inc, USA.
Dr. Great has had a broad and exciting work experience and career in the private and public sectors of the economy. His experience is interspersed with international agencies enterprise and multiple portfolio project management capabilities, which has empowered him to deliver creditably to best practices in the energy industry. Dr. Great is an expert in transaction advisory and equity management matters. He has successfully managed several portfolios of World Bank financed projects, AFD financed projects and other large-scale projects of similar proportion.
Dr Great holds a Doctorate Degree in Project Management from Walden University, USA, a PhD in Power Engineering ABU (In View), and a Master of Philosophy Degree in Electric Power System Planning and Operation from the University of Science and Technology Port-Harcourt Nigeria, and an MBA in Marketing Systems Management from Lagos State University, Nigeria.
An astute businessman and chattered engineering professional and consultant, Dr. Great is versatile in Power System Utilities management. He is also a Chattered Management Consultant (CMC) with practicing license, and a Fellow of International Institute of Management Consultants. He is a power industry expert regulator and a Fellow of Nigeria Society of Engineers (FNSE). Dr Great is also a member of Nigeria Institute of Management and the Chattered Institute of Marketing. He is married with children.
DETAILS OF SOME OF DR GREAT’S CV – HV POWER PROJECT EXPERIENCES
| S/N | Duration | Assignment name/& brief description of main deliverables/output
|
Name of Client
& Country of Assignment
|
Role on the Assignment |
|
|
2019 -2024 |
Contract for Consultancy Services:
ANAMBRA 100MW GAS FIRED INTEGRATED POWER POWER PROJECT
Scope: Project Management and supervision for the following projects: Projects:
i. Lot 1: 100MW Power Plant and 11/330 KV step up transformer Swichyard
|
AGFIPP
Engr. IKE ODUMEZUE Project Manager
|
|
|
ii. Lot 2:2 x 330 kV Tx Line Networks |
Project management & Supervision for EPC contract | |||
| iii. Lot 3: 2x132kV Transmission lines | Project management & Supervision for EPC contract | |||
|
iv. Lot 4:2×132/33kV proposed substations |
Project management & Supervision for EPC contract | |||
|
v. Lot 5A: Gas Wells Development
vi. Lot5B: Gas Pipelines Connectivity |
Project management & Supervision for EPC contract | |||
| vii. Lot 6: SCADA network development
|
Project management & Supervision for EPC contract | |||
| Deliverable:
i. Preparation of ICB bidding documents according to AGFIP standard documents. ii. Preparation of technical design, specifications and drawings. iii. Review and approval of environmental, social and management plan. iv. Review of feasibility study v. Bidding and contracting vi. Project management and contract administration vii. Engineering and construction supervision viii. Manufacturing/inspection ix. Environmental and social monitoring
|
Project management & Supervision for EPC contract | |||
|
|
March 2012 – 2016 | Assignment Name:
Engineering, Procurement And Construction Of Kabba and Sagamu 330 kV HV Power System Transmission Lines and Substation Reinforcement and Extension Project
Scope: 2No. 60MVA transformers, construction of 132kV switchyard at Kabba, Kogi State and Construction 33kV switchyard with outgoing 33kV feeder Bays, Control Rooms and all other associated works
No. 60MVA transformers, construction of 132kV switchyard at Sagamu, Ogun State and Construction 33kV switchyard with outgoing 33kV feeder Bays with all associated Control Room and Foundation Civil Works
Deliverables:
|
|
Project Director for all EPC Works
|
|
|
Marc, 2016-2019 | Contract for Consultancy Services: Abuja Feeding Scheme Transmission Projects- Project Management & Supervision
CNG 1021: Reinforcement of High Voltage Transmission Ring Round Abuja.
AFD Loan: USD 170M
Scope: Project Management and supervision for the following projects: Projects:
viii. Lot 1: 330kV Double Circuit Line(143km) from New Lafia SS to the proposed New Apo (Pigba) SS, Tx Line
|
Transmission Company of Nigeria (TCN) ,
Engr. P. N. OGU Project Manager +2348033375852u |
Project Consultant/Technical Assistant |
|
ix. Lot 2:2 x 132kV Tx Line Networks |
Project management & Supervision for EPC contract | |||
|
x. Lot 3:2x150MVA, 330/132/33kV proposed New Apo Substation |
Project management & Supervision for EPC contract | |||
|
xi. Lot 4:2x150MVA, 330/132/33kV proposed West Main substation (Lugbe) |
Project management & Supervision for EPC contract | |||
|
xii. Lot 5A: 3x60MVA, 132/33kV proposed Kuje substation & Line bays) xiii. Lot5B:2X60MVA, 132/33kV proposed Wumba/Lokogoma substation |
Project management & Supervision for EPC contract | |||
| xiv. Lot 6: 3X60MVA, 132/33kV proposed Gwarimpa GIS substation
|
Project management & Supervision for EPC contract | |||
| Deliverable:
x. Preparation of bidding documents according to AFD standard documents. xi. Preparation of technical design, specifications and drawings. xii. Review and approval of environmental, social and management plan. xiii. Review of feasibility study xiv. Bidding and contracting xv. Project management and contract administration xvi. Engineering and construction supervision xvii. Manufacturing/inspection xviii. Environmental and social monitoring
|
Project management & Supervision for EPC contract | |||
|
|
March 2012 – 2016 | Assignment Name:
CONSULTANCY SERVICES FOR 2X60 MVA, 132/33KV SUBSTATION AT EDE 2X132KV LINE BAY EXTENSION AT OSHOGBO.
Scope: 2No. 60MVA transformers, construction of 132kV switchyard, Construction 33kV switchyard with 4No. outgoing 33kV feeder, And all other associated works Deliverables:
|
Power Holding Company of Nigeria Plc (PHCN)/Transmission Company of Nigeria (TCN) , Nigeria
Engr. Aguiyi Godwin (+2348037053941)
|
Project management & Supervision for EPC contract
|
|
|
March 2012 – 2016 | Assignment Name:
CONSULTANCY SERVICES FOR THE SUPERVISION OF LOT 9: OSHOGBO- EDE 132KV DC LINE (15) KM.
Deliverables:
|
Power Holding Company of Nigeria Plc (PHCN)/Transmission Company of Nigeria (TCN)
Engr. Ogwu L. C. (+2348036136486) |
Project management & Supervision for EPC contract |
|
|
March 2012 – 2016 | Assignment Name:
CONSULTANCY SERVICES FOR 2X60MVA, 132/33KV SUBSTATION AT OKE –AGBE 2X132KV LINE BAY EXTENSION AT OBAJANA.
Deliverables:
|
Power Holding Company of Nigeria Plc (PHCN)/Transmission Company of Nigeria (TCN)
Engr. Aguiyi Godwin (+2348037053941) |
Project management & Supervision for EPC contract |
|
|
Jun.2008-Sept.2010 | Assignment Name:
CONSULTANCY SERVICES FOR THE CONSTRUCTION OF 2X30/40MVA, 132/33KV SUBSTATION AT OGOJA, CROSS RIVERS STATE.
Deliverables:
|
Power Holding Company of Nigeria Plc (PHCN)/Transmission Company of Nigeria (TCN)
Engr. Ajibade M. A. (+2348035890382) |
Project management & Supervision for EPC contract |
|
|
Jun.2008-Sept.2010 | Assignment Name:
CONSULTANCY SERVICES FOR THE CONSTRUCTION OF 2X132 KV TRANSMISSION SWITCHING STATION AT OBUDU, CROSS RIVERS.
Deliverables:
|
Power Holding Company of Nigeria Plc (PHCN)/Transmission Company of Nigeria (TCN)
Engr. Ajibade M. A. (+2348035890382) |
Project management & Supervision for EPC contract |
|
|
Jun.2008-Sept.2010 | Assignment Name:
CONSULTANCY SERVICES FOR THE CONSTRUCTION OF 46KM 2X132KV DC LATTICE TOWER TRANSMISSION LINE FROM OBUDU TO OGOJA, CROSS RIVERS STATE. Deliverables:
|
Power Holding Company of Nigeria Plc (PHCN)/Transmission Company of Nigeria (TCN)
Engr. Ajibade M. A. (+2348035890382) |
Project management & Supervision for EPC contract |
|
|
|
Project management & Supervision for EPC contract | ||
|
Project management & Supervision for EPC contract | |||
|
Project management & Supervision for EPC contract | |||
|
Project management & Supervision for EPC contract | |||
|
Project management & Supervision for EPC contract | |||
|
|
Mar.2006-Apr.2007 | Assignment Name:
Construction of 132kV Delta State Grid Transmission line from Delta iv Power Station at Ekakpamre to Ugheli and 2no 2×15 MVA, 132/33kV Injection Transformer.
Deliverables:
|
Ministry of Works | Sub Contractor |
|
|
March, 2016-August 2017 | Assignment Name:
Consulting Services: Technical Assistance for Valuation, Planning and Management of All Transmission Project in Nigeria.
Scope/Deliverable: i. Site inspection for over 400 transmission lines and substation projects nationwide. ii. Valuation and management iii. Prepared a comprehensive list of all on-going and planned TCN projects iv. Carried out concise research on the history of the projects to identify challenges and develop a framework for their completion v. Visited all project sites to identify the status of work for each project vi. Investigated contractor’s non-performances in execution of the project and recommended solutions vii. Carried out a cost analysis for the project client to complete pending projects. viii. Developed a database for status reporting, monitoring and evaluation of on-going projects |
Transmission Company of Nigeria (TCN) | Project valuation, planning and management. |
|
|
||||
|
|
||||
|
|
|
|||
|
|
2011-2012 | Consultancy for Sale of Shares in Eleven Successors Distribution Companies Created out of the Power Holding Company of Nigeria
Deliverables: a) Prepared inception report for the project b) Developed the technical bidding document for the project c) Preparation of Commercial bid documents for the project d) Developed an acceptable progress and Business Plan for Bureau of Public Enterprise (BPE) and the Evaluators. e) Carried out evaluation of the technical bids submitted by the bidders f) Liaise with BPE and FGN stakeholders to be able to prepare a responsive bid and Ultimately secure the bid
|
Cable & Rods Company Ltd/BPE/Federal Govt. | Consultancy services |